PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolting Derrick -8 (Roof) Facing South-West (800x600).jpg Bolting Derrick -8 (Roof) Facing West (800x600).jpg Continued grading the site Facing South (800x600).jpg Installing metal decking at Derrick -7 (2nd Floor) Facing West (800x600).jpg Installing safety poles around Derrick -7 (2nd Floor) Facing South-East (800x600).jpg Safety Poles around Derrick -7 (2nd Floor) Facing South-East (800x600).jpg Welding column at the Monumental Stairs Facing South (800x600).jpg Welding Derrick -5 (4th Floor) Facing North-East  (800x600).jpg Drilled holes at Elev. 5,6 for the rebar prepping for the slab on grade Facing West (800x600).jpg
Previous pageNext page Installing safety poles around Derrick -7 (2nd Floor) Facing South-East (800x600)
Installing safety poles around Derrick -7 (2nd Floor) Facing South-East (800x600)